Timber Site Inspection
CFK PRE-INSTALLATION · ATFA STANDARD
EVIDENCE RECORD
3
Subfloor
Select all areas
4
Moisture Readings
Tramex surface only
Take 3 readings: entry, centre, far end. If any reading exceeds 5.5% — stop and notify your salesperson.
⛔ READING TOO HIGH — Stop immediately. Do not proceed.
Notify your salesperson now — do not contact the client directly.
⚠ ELEVATED READING — Record and notify your salesperson to review before proceeding.
⚠ LOW HUMIDITY (below 35%) — Boards may shrink and gap. Notify your salesperson.
⚠ HIGH HUMIDITY (above 70%) — Boards may swell and cup. Notify your salesperson.
Floor is flatMax 3mm deviation over 3 metres
Moisture barrier appliedGround level slabs — always required
Subfloor cleanNo dust, paint, oil or debris
Hebel primedCompatible primer fully cured before adhesive
Heating / cooling runningMust be on before and during installation
MS Polymer confirmedNever water-based or rigid epoxy
Capture each item
Tap to take or upload. Photos appear in your PDF report.
📋
Complete all checks above
Fill in every section to generate your report
Fill in all sections → tap Print / Save as PDF → save to phone → email PDF to office → attach to BOS job.