Timber Site Inspection

CFK PRE-INSTALLATION · ATFA STANDARD
EVIDENCE RECORD
1

Job Details

°C
2

Product

3

Subfloor

Select all areas
4

Moisture Readings

Tramex surface only

Take 3 readings: entry, centre, far end. If any reading exceeds 5.5% — stop and notify your salesperson.

Reading 1 — Entry
%
Reading 2 — Centre
%
Reading 3 — Far End
%
✓ PASS = 5.5% or under
⛔ READING TOO HIGH — Stop immediately. Do not proceed.
Notify your salesperson now — do not contact the client directly.
⚠ ELEVATED READING — Record and notify your salesperson to review before proceeding.
Room Air Humidity (RH)
Hygrometer reading — the air the floor will live in
% RH
✓ IDEAL = 40–60% RH
⚠ LOW HUMIDITY (below 35%) — Boards may shrink and gap. Notify your salesperson.
⚠ HIGH HUMIDITY (above 70%) — Boards may swell and cup. Notify your salesperson.
5

Site Checks

Floor is flatMax 3mm deviation over 3 metres
Moisture barrier appliedGround level slabs — always required
Subfloor cleanNo dust, paint, oil or debris
Hebel primedCompatible primer fully cured before adhesive
Heating / cooling runningMust be on before and during installation
6

Adhesive

MS Polymer confirmedNever water-based or rigid epoxy
7

Photo Evidence

Capture each item
Tap to take or upload. Photos appear in your PDF report.
📱Tramex
Entry
Take / Upload
📱Tramex
Centre
Take / Upload
📱Tramex
Far End
Take / Upload
💧Room RH
Hygrometer
Take / Upload
🪣Adhesive
Label
Take / Upload
🛡Moisture
Barrier
Take / Upload
8

Notes

📋
Complete all checks above
Fill in every section to generate your report

Fill in all sections → tap Print / Save as PDF → save to phone → email PDF to office → attach to BOS job.